888-564-4897

Who doesn’t love the look of wood floors? They add beauty and luxury to any room. The installation process of wood floors can be tricky, and we recommend hiring a professional when adding new floors or repairing/restoring current wood flooring. However, some want to tackle the job on their own! There are many online resources available to help. We’ve added a step-by-step guide here as a resource for you, and if you’re looking at how to take care of your floors after the job’s done, take a look at these wood floor cleaning tips.

Choose the Boards

Choose the wood species and board widths for the room installation.

Measure the Room

Measure the width and length of the room and multiply for the square footage. When ordering hardwood flooring, allow 10-15 percent extra for irregular boards and any cutting mistake.

Check for a Squeaky Floor

Check the sub-floor. Minimum requirements are a 3/4″ plywood sub-floor. Make sure there are no squeaks in the floor. If there’s a squeak, screw a long drywall screw into the sub-floor and joist where the squeak occurs. Remove floor molding from the room, and sweep and clean thoroughly. Something like Bissell floor cleaning products would be good for the job.

Roll Out the Vapor Barrier Paper

Roll out strips of vapor barrier paper, allowing at least a 4″ overlap and staple securely to the sub-floor. Use 15 lb tar paper or felt. Mark with a pencil along the baseboards where the joists are located.

Start Installation

Start the installation at the longest unobstructed wall. Remove the floor molding, and snap a chalk line 3/8″ out from the baseboard. (This allows for expansion in the hot, humid weather and contraction in the colder, drier weather of the wood flooring.)

Place the Boards

Begin by selecting a long board to start the first row. Pick one that is straight. Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub-floor and joist. Face-nail each board at the point of every joist and set the nail with a nail-set. Face-nail the entire first row and remember to keep the board lengths random. It is important to face-nail the first row because the pneumatic nail can’t get down in there. It will hit the wall and the force would push the wood against the baseboard, which would lose the 3/8″ expansion and contraction.

It is important to lay the first boards perpendicular to the joists which are underneath. That is important because you want a nice solid anchor. Look at the subfloor to see which way the nails and seams ran. Try to go underneath the crawl space to see how they run.

Hand-Nail the Rolls

After the first few rows have been installed, drill pilot holes down into the tongue of each board and hand-nail the rolls until there is enough clearance for the heavy duty electric nail gun.

Tip: Lay out a box of wood boards ahead of the installation to visualize lengths, wood grain and colors of the boards. When laying out the boards, keep in mind to never have the ends of boards in adjacent rows line up with each other. Keep the lengths random and at least 6″ in length.

Staple the Boards

Using the nail gun, place the gun lip over the edge of the board and strike firmly with the mallet, driving the staple into the tongue of the hardwood plank.

When installing up to a threshold, it is not critical to make cuts exact. Come back later after the floor has been installed and use a circular saw to cut across for a precise cut.

Cutting the Baseboard

When cutting along the baseboards, select a piece that will fit in there and leave 10 or 12 inches more and cut it off. Use the other piece on the beginning of the next row. You don’t always have to get it real close, and throw out the end piece. That will save some time and waste.

Fill in the Gaps

Be sensitive to the way the ends fit together. One end has a tongue and the other end has a groove; this is called end matched. Make sure to always cut the wall end of the wood so that you do not cut off the groove that fits to the tongue. If that happens, that would result in a pretty big gap. Find a piece and lay it alongside the hole and flip it over. Make sure when you make the mark to cut off the wall side, not the room side. When you make the mark, butt it up against the baseboard and then mark at the end of that tongue. That will leave a 3/8″ gap for expansion and contraction when installing the piece.

Note: Before nailing, make sure to put at least two nails in every board. The rule of thumb is to place a nail every 10″ to 12″.

Work Around Clearance Issue

As you near the opposite wall, clearance for the nail gun again becomes an issue. Drill pilot holes and hand-nail the boards until there is no longer clearance for the drill and hammer. At that point, drill pilot holes down into the top of the boards and face-nail the boards, remembering to set the nails with a nail-set.

Tip: Use a pry bar and a few extra scraps of flooring to firmly seat the hardwood plank as you nail.

Fit Last Board Into Place

If there’s a narrow gap for the last board, take a measurement and rip (cut length-wise) the last board to fit into place. Remember to leave a 3/8″ gap at the end wall for expansion and contraction space.

Fill Holes With Wood Putty

Replace shoe molding in the room and putty all of the nail holes that have been face-nailed. Be sure to get wood putty that matches the floor. Fill the hole and wipe off the excess.

Wood Floor Maintenance

Maintenance is easy for a pre-finished wood floor — keep grit off of the surface by sweeping regularly, and use a flooring cleaning kit (alcohol-based). Spray on and wipe off with a damp cloth. Wood floors also help cut down on dust mites.

In Conclusion

Simple right? All good things come with effort… This tutorial is credited to the DIY Network.